Consultation results

Extras

Tackling Congestion in Cambridgeshire – results from the consultation campaign

On the 6 May 2008, the County Council hosted an event to release the findings of the consultation campaign into proposals for tackling congestion that took place between November 2007 and March 2008. The findings were delivered directly by the two organisations responsible for collecting and collating people’s views. Each organisation produced a presentation for the event and a report. The findings of the consultation can be accessed from the links on the right-hand side of this page.

Survey results

Findings from the online and face-to-face surveys were produced by MR-UK who conducted the surveys for the Council.

Workshop findings

Findings from the workshops were produced by Dialogue by Design who facilitated the workshops for the Council.

Feedback received directly by the County Council

This report presents the findings from the responses received directly by the Council.

Following the publication of all of the consultation results, the County Council will be considering the results and preparing a report for Cabinet later this year.



©Cambridgeshire County Council 2009 : Shire Hall, Castle Hill, Cambridge, CB3 0AP : 0345 045 5200 : Privacy Statement