We maintain over 3,200 individual structures across the county on behalf of our communities, these include: 

  • 950 road bridges
  • 142 pedestrian bridges
  • 124 kilometres of safety fencing
  • 2,200 right of way bridges over 5 metres in length
Pedestrian bridge over top of road leading to roundabout

The information here provides details on the planned repairs to these structures across the county that we will be undertaking throughout 2024 and 2025.

The scale and type of work will vary depending on the scheme and the repair being undertaken.

Most of our work will be delivered either under a road closure or local traffic management system, such as traffic lights. This will cause disruption to the road network as a result while we are on site. Thank you for your patience and cooperation during these critical works.

As well as the large-scale work on structures, planned in advance, we also continually do reactive repairs across the whole county. In 2024/25, we have assigned over £1.4 million for minor improvements to structures in Cambridgeshire. This will cover installing new decking, parapets and waterproofing.

We identify structures requiring repair through routine inspection or if an issue has been reported by a member of the public. This helps keep our structures safe and sound.

Planned work by district for 2024-2025

Updates are provided monthly by officers. Expand the district to see when and where the work will take place, and details of road closures and diversion routes.

Whilst we aim to be as accurate as possible with the below times and dates, there are instances where these may change at short notice.

Parish / Town Road Start date Duration Map Link
Cambridge Footpath 81 1 February 2025 12 weeks. Working hours 7.30am to 6.30pm.  
Cambridge Milton Road 1 October 2024 8 weeks. Working hours 7.30am to 6.30pm.  
Cambridge Newmarket Road 1 November 2024 8 weeks. Working hours 7.30am to 6.30pm.  

Parish / Town Road Start date Duration Map Link
Kirtling Newmarket Road To be confirmed 4 weeks. Working hours 7.30am to 6.30pm.  
Coveney Footpath 3 To be confirmed 6 weeks. Working hours 7.30am to 6.30pm.  

Parish / Town Road Start date Duration Map Link
March Broad Street 6 October 2024 12 weeks. Working hours 7.30am to 6.30pm.  

Parish / Town Road Start date Duration Map Link
St Ives London Road 6 January 2025 30 weeks. Working hours 7.30am to 6.30pm.  

Our 2024/25 programme currently does not include capital maintenance work here, but other reactive highways repairs are always being delivered. We are now planning the capital maintenance work for your area for 2025/26. Find out more in FAQs.

Parish / Town Road Start date Duration Map Link
         

Roadwork and traffic information

Our interactive map gives you more detail on the latest roadworks, road closures and diversions. Works listed on this page are included.

Visit our road and traffic information page to access the map and instructions on how to use. Details of upcoming roadworks in PDF format are also provided.

The map uses data from Causeway one.network. Enter your road name and see the types of work happening today or in the next two weeks, three or twelve months.

You can also follow us on X (formerly Twitter) for updates on where we are working - @Cambs_Traffic

Can't find what you are looking for?

If you are unable to find a scheme on this page, it may be part of our reactive or cyclical maintenance programmes.

These works are more area based and include gully cleansing, road patching and public rights of way maintenance.

You can find out more about the county-wide road resurfacing programme on our Road improvements page.

FAQ

Please read through our frequently asked questions. If you are unable to find the answer please contact us.

The work area is the section of the road where our operatives will be working. The road closure area often extends beyond this to manage through traffic and divert it on to an alternative route. This helps us do the work quickly and efficiently, while keeping residents, road users and the workforce safe. 

If you receive information notifying you about a road closure, we will include a map which indicates both the work and road closure areas if these are different.

As the work involves heavy plant and equipment, we cannot guarantee you will be able to access your property without having to wait or access via the other end of the works.

If you normally drive into or out of the work area during the hours when the closure is in place, we may ask you to please make alternative arrangements.

We will often phase works to try to reduce the disruption this can cause, and the site team will be available to communicate with residents and businesses regarding this.

We will always maintain access to properties if it is safe to do so. Delays will sometimes be unavoidable when we must move machinery or equipment out of the way. We thank you for your patience and cooperation while this is done.

Work is phased to allow property access from at least one end of the road. Access may differ, depending on where we are working.

We place advance warning signs at the starting points of our works at least 14 days before the work starts.

We will inform residents and businesses which are located with the area of work, via letter or leaflet drop, at least 14 days in advance of work starting, wherever possible.

We try to keep noise to a minimum, and plan noisier working activities for earlier on in shifts where we are working at night in residential areas. However, the work is being delivered using heavy plant and machinery and this will cause noise and disruption whilst the work is on site, especially where we are working overnight. To try to limit this we:

  • Consider alternative ways of working, for example during the day, instead of night, when working in residential areas at the weekend.
  • Working reduced hours overnight. This approach often means a longer delivery programme, whereas working longer shifts will result in the work being completed quicker.
  • Working during the day whenever we can to reduce costs and disruption to residents during unsociable hours.

Contact

To report an issue with a road, please visit our report a highways fault page.

If you have any queries or require any additional information please email: Local.Highways@cambridgeshire.gov.uk

Capital maintenance programme

For more information on the workstreams covered please visit our capital maintenance programme page