EN
Accessibility Options

Transport Delivery Plan

The Cambridgeshire Transport Delivery Plan (TDP) is a three year plan that provides a forward look at all of the planned highway and transport capital schemes on the local network that are in all probability going to be delivered in the three year timeframe. 

The TDP Introduction document below explains the inclusions and exclusions of schemes in the plan. All schemes planned for delivery on the local network are included irrespective of the delivery agent or funding source. Further information on the programmes included in the TDP is shown in the Introduction document. 

The current plan is for the period 2019/20 to 2021/22. Schemes are grouped by district.

Transport Delivery Plan 2019-2022

Size: 199.33 KB File format: pdf

Did you find this information useful?

Loader